Sıra No | İş Kalemi No | Açıklama | Birimi | Miktarı |
---|---|---|---|---|
1 | ZNG.BLD.1 | HER CİNS ÇİMENTONUN TAŞITLARA YÜKLEME, BOŞALTMA VE İSTİFİ | ton | 585,460 |
2 | ZNG.BLD.2 | KUM, ÇAKIL, TUVENAN, STABİLİZE VE KİL'İN TAŞITLARA YÜKLEME, BOŞALTMA VE FİGÜRESİ | m3 | 2123,920 |
3 | ZNG.BLD.3 | MOLOZ, BLOKAJ, KIRMA TAŞ, KALKER TAŞININ TAŞITLARA YÜKLEME VE BOŞALTILMASI | m3 | 126,360 |
4 | ZNG.BLD.4 | HER CİNS DEMİR VE DKP SAÇLARININ TAŞITLARDAN BOŞ. VE İSTİFİ | ton | 75,270 |
5 | ZNG.BLD.5 | EL İLE YUMUŞAK TOPRAK KAZILMASI (SERBEST KAZI) | m3 | 143,200 |
6 | ZNG.BLD.6 | EL İLE YUMUŞAK KÜSKÜLÜK KAZILMASI (SERBEST KAZI) | m3 | 143,200 |
7 | ZNG.BLD.7 | YUMUŞAK VE SERT TOPRAKTA GENİŞ DERİN KAZI YAPILMASI | m3 | 43,900 |
8 | ZNG.BLD.8 | YUMUŞAK VE SERT KÜSKÜLÜK ZEMİNDE GENİŞ DERİN KAZI YAPILMASI | m3 | 26,340 |
9 | ZNG.BLD.9 | PATLAYICI M. KULLANMADAN YUMUŞAK KAYADA GENİŞ DERİN KAZI YAPILMASI | m3 | 17,560 |
10 | ZNG.BLD.10 | YUMUŞAK VE SERT TOPRAKTA DAR DERİN KAZI YAPILMASI | m3 | 1,750 |
11 | ZNG.BLD.11 | YUMUŞAK VE SERT KÜSKÜLÜK ZEMİNDE DAR DERİN KAZI YAPILMASI | m3 | 1,050 |
12 | ZNG.BLD.12 | PATLAYICI M. KULLANMADAN YUMUŞAK KAYADA DAR DERİN KAZI YAPILMASI | m3 | 0,700 |
13 | ZNG.BLD.13 | A-MAK.İLE YUMUŞAK VE SERT TOPRAK KAZILMASI (SERBEST KAZI) | m3 | 1076,380 |
14 | ZNG.BLD.14 | A-MAK.İLE YUMUŞAK VE SERT KÜSKÜ KAZILMASI (SERBEST KAZI) | m3 | 733,580 |
15 | ZNG.BLD.15 | MAKİNE İLE PATLAYICI MADDE KULLANILMADAN YUMUŞAK KAYA VEYA BATAK VE BALÇIK KAZILMASI ( SERBEST KAZI) | M3 | 430,550 |
16 | ZNG.BLD.16 | B-MAK.İLE HER DERİNLİKTE YUMUŞAK VE SERT TOPRAĞIN KAZILMASI (GENİŞ DERİN) | M3 | 414,350 |
17 | ZNG.BLD.17 | B-MAK.İLE HER DERİNLİKTE YUMUŞAK VE SERT KÜSKÜLÜK ZEMİNİN KAZILMASI (GENİŞ DERİN) | M3 | 388,740 |
18 | ZNG.BLD.18 | B-MAKİNA İLE (PATLAYICI MADDE KULLANMADAN) YUMUŞAK KAYA VE BATAK VE BALÇIK KAZILMASI (GENİŞ DERİN) | M3 | 165,750 |
19 | ZNG.BLD.19 | C-MAK.İLE HER DERİNLİKTE YUMUŞAK VE SERT TOPRAĞIN KAZILMASI (DAR DERİN) | M3 | 125,940 |
20 | ZNG.BLD.20 | C-MAK.İLE HER DERİNLİKTE YUMUŞAK VE SERT KÜSKÜLÜK ZEMİNİN KAZILMASI (DAR DERİN) | M3 | 75,570 |
21 | ZNG.BLD.21 | C-MAKİNA İLE (PATLAYICI MADDE KULLANMADAN) YUMUŞAK KAYA VE BATAK VE BALÇIK KAZILMASI (DAR DERİN) | M3 | 50,380 |
22 | ZNG.BLD.22 | MAKİNE İLE TUVENAN KUM ÇAKIL TEMİN EDİLEREK, MAKİNE İLE SERME, SULAMA, SIKIŞTIRMA YAPILMASI | M3 | 145,400 |
23 | ZNG.BLD.23 | MAKİNE İLE TUVENAN KUM ÇAKIL TEMİN EDİLEREK, EL İLE SERME, SULAMA, SIKIŞTIRMA YAPILMASI | M3 | 2861,220 |
24 | ZNG.BLD.24 | MAKINA ILE DEMIRLI VE DEMIRSIZ BETON INŞAATIN YIKILMASI | M3 | 64,130 |
25 | ZNG.BLD.25 | DOĞAL PARKE TAŞI, BETON PLAK, ADI KALDIRIM VE BLOKAJ SÖKÜLMESI. | M2 | 500,000 |
26 | ZNG.BLD.26 | 150 DOZ DEMİRSİZ BETON | M3 | 125,950 |
27 | ZNG.BLD.27 | BASINÇ DAYANIMI C 16/20 (BS.16) OLAN DEMİRSİZ BETON (GRANÜLOMETRİK KUM VE ÇAKIL İLE) | M3 | 339,880 |
28 | ZNG.BLD.28 | BASINÇ DAYANIMI C 20/25 (BS.20) OLAN BETONARME BETONU (GRANÜLOMETRİK KUM VE ÇAKIL İLE) | M3 | 1053,040 |
29 | ZNG.BLD.29 | SATIN ALINAN VE BETON POMPASIYLA BASILAN, BASINÇ DAYANIM SINIFI C 35/45 (BS 35) OLAN HAZIR BETON DÖKÜLMESI (BETON NAKLI DAHIL) | M3 | 265,780 |
30 | ZNG.BLD.30 | OCAK TAŞI İLE 200 DOZLU ÇİMENTO HARÇLI KARGİR İNŞAAT | M3 | 90,980 |
31 | ZNG.BLD.31 | OCAKTAN ÇAPLANMIŞ MOLOZ TAŞI İLE 200 DOZLU ÇİMENTO HARÇLI KARGİR İNŞAAT | M3 | 15,630 |
32 | ZNG.BLD.32 | 200 KG ÇİMENTO DOZLU TESVİYE TABAKASI YAPILMASI | M2 | 12,500 |
33 | ZNG.BLD.33 | PREFABRİK BETON PARKE İMALİ VE YERİNE DÖŞENMESİ (8 cm) | M2 | 500,000 |
34 | ZNG.BLD.34 | DÜZ YÜZEYLİ BETON VE BETONARME KALIBI | M2 | 5288,640 |
35 | ZNG.BLD.35 | AHŞAP KALIP İSKELESİ (4 METREYE KADAR, 4M DAHİL) | M3 | 2627,430 |
36 | ZNG.BLD.36 | AHŞAP KALIP İSKELESİ (4,01-6 METREYE KADAR, 6M DAHİL) | M3 | 875,000 |
37 | ZNG.BLD.37 | 0-12,50 M ARASI YÜKSEKLİKTEKİ DUVARLAR İÇİN İŞ İSKELESİ KURULMASI (12,50 M. DAHİL) | M2 | 1735,500 |
38 | ZNG.BLD.38 | Ø 8-12 MM LİK İNCE NERVÜRLÜ ÇELİĞİN BÜKÜLÜP DÖŞENMESİ | ton | 14,560 |
39 | ZNG.BLD.39 | Ø 14-28 MM LİK KALIN NERVÜRLÜ ÇELİĞİN BÜKÜLÜP DÖŞENMESİ | ton | 53,860 |
40 | ZNG.BLD.40 | MOLOZ TAŞ DUVAR YÜZEYLERİNE KABARTMA DERZ YAPILMASI | m2 | 62,500 |
41 | ZNG.BLD.41 | ÇEŞİTLİ DEMİR İŞLERİ YAPILMASI VE YERİNE KONULMASI | kg | 608,370 |
42 | ZNG.BLD.42 | Ø300 mm ANMA ÇAPLI HDPE ESASLI KORUGE BORUSU DÖŞENMESİ | mt | 300,000 |
43 | ZNG.BLD.43 | Ø600 mm ANMA ÇAPLI HDPE ESASLI KORUGE BORUSU DÖŞENMESİ | mt | 50,000 |
44 | ZNG.BLD.44 | Ø 150 MM KORUGE BORU İLE BARBAKAN YAPILMASI VE YERİNE KONULMASI | mt | 23,670 |
45 | ZNG.BLD.45 | ÇİMENTO NAKLİ (FABRİKADAN) M=50 KM. | ton | 515,770 |
46 | ZNG.BLD.46 | KUM-ÇAKIL NAKLİ (OCAKTAN) M= 42 KM. | m3 | 1871,730 |
47 | ZNG.BLD.47 | TAŞ NAKLİ (OCAKTAN) M= 16 KM. | ton | 126,360 |
48 | ZNG.BLD.48 | DEMİR NAKLİ (KARABÜKDEN) M= 176 KM. | ton | 75,270 |
49 | ZNG.BLD.49 | TUVENAN MALZEME NAKLİ (KOZLU SAHİLDEN) M= 5 KM. | m3 | 3006,620 |
50 | ZNG.BLD.50 | PARKE NAKLİ (FABRİKA'DAN) M=45 KM. | m2 | 85,500 |
51 | ZNG.BLD.51 | KAZI MALZEMESİ NAKLİ (ÇÖP DÖKÜM SAHASINA) M= 5 KM. | m3 | 4175,130 |